Monday, September 20, 2010

SITE ANALYSIS CRITICAL PATH
1. get the land surveyed first and beacons established
2. get the architect to begin designing and only do topographical survey to resolve any problem that he may encounter with determination of levels
3. get the civil engineer to design the road as part of his overall commission so that any studies to facilitate design will be part of his design work (which may realise some saving)
4. get the electrical engineer to do his studies as part of his overall commission as the case with the civil engineer
5. do water studies later into the project as part of civil engineering work with outsourcing of laboratory testing