RUIRI AMANI HOME
Brief for Teleconference for 3 PM Kenya time, Friday 19th November 2010
Summary of Commonly Agreed Positions To-Date
DUTIES/OBLIGATIONS
Local team (Consultants)
The whole professional team will be employed in Kenya and will follow a traditional route.
Receive ideas for the construction to be incorporated into the Client Brief
Evaluate them at a local level as to how they can be incorporated etc.
Determine the extent of the feasibility study based on those 'wants'.
Respond and make proposals for implementation etc.
Carry out all the concept and detailed designs,
Obtain all consents,
Programming and cost control etc,
Bid documentation
Procurement of contractor
Execution of construction contracts
Supervision (quality, program,
Fees will be 15% of the project Cost (disbursements included, but net of VAT)
Client Team
Agree project objectives and scope
Formulate Client brief and agree as Client team
Give brief including ideas for the construction to be incorporated into the design by the local team
Provide necessary documents (title deed, rates, etc) to facilitate planning
Comment on master plan by making observations about the best place to locate all the buildings on the site
Provide ideas/proposals/designs for innovations to be incorporated in the design e.g. dry stone walls, green roofs, eco-drainage etc
Ideas from Client
Buildings' occupancy & use: Reconfirmation that we want 8 'cottages' and one central building.
Each cottage to house up to 10 children with 1 house mother.
Each cottage to have 2 dormitories and one housemother's room.
Each cottage to have toilet and shower facilities for each dormitory (and also for housemother?).
One communal space for each cottage for children to study/meet/live etc.
The central building to house a small office/reception.
Cooking facilities for the whole community
Washing and laundry facilities.
Etc
FUNDAMENTAL ISSUES TO BE RESOLVED IMMEDIATELY
Provision of potable water to site,
Site enclosure,
Access road,
Drainage,
Hot water,
Power etc
A.INTRODUCTIONS:
LOCAL CONSULTANTS
Lead Consultant/Quantity Surveyor:
Nyagah Boore Kithinji
Costwise Associates
Architect
Dominic Otengo Motanya
Baseline Architects
Civil / Structural Engineer
Peter Kimari Gitau
Batiment Consulting Engineers
Electrical+Mechanical Engineer
Eric Obare
Steve Boyo
Vekta Consultants
Environmental Impact Assessment Expert
Nicky Munyaka Nzioki (not in conference today)
CLIENT TEAM
Chris Seeley
Lisa Lee Benjamin
Karambu Ringera
Karla Darkin?
Mark Querfuth?
Nick Atken?
B.ROLES/CHAIN OF COMMUNICATION AND COMMAND
Link between Consultants and Client team to be the Lead Consultant
Link between Contractor and Client team to be Lead Consultant
Link between Consultants and Contractors to be direct, under the direction of the Lead Consultant
C.SCHEDULE
To be through with design by end of February, subject to how soon the brief is supplied
CAD drawings
Word documents
PDFs where necessary
ITEMS HIGHLIGHTED BY CLIENT
1. feasibility studies/ survey-
-progress
-questions/findings
-how will be documented..? base survey( need this info from
kithinji)
2.stone symposium/workshop
-schedule
-compensation/details
-local Labor
3. cottage/design
-schedule for cost drawings
-update from mark
4 master plan
-schedule